Air Quality Alert: Wildfire smoke is affecting air quality in Southfield. Sensitive groups should limit outdoor activity. Read the full advisory for recommendations and updates.
Northland MP Amendment
Content
The Northland Sub Area Master Plan Amendment includes all of the following documents:
- Northland Concept Vision Redevelopment Plan (PDF)
- Northland Hudson’s Building and Former Powerhouse Mixed Use Feasibility Study (PDF)
- Northland Design Guidelines 5-22-17 (PDF)
Northland Sub Area Plan Timetable
2/6/17 Presentation to Council of Draft Design Guidelines and ODD Regulations
2/13/17 Authorization to send Letter of Intent of Sub Area Plan amendment and distribution of Draft Plan
2/14/17 Release Letter of Intent
2/17/17-3/30/17 Required Public Review Period (42 days)
3/24/17 Presentation to DDA
4/19/17 Planning Commission (P.C.) Study Session
4/26/17 P.C. Public Hearing & Recommendation of the Sub Area Plan and ODD
5/8/17 or 5/15/17 C.O.W. Study Session
5/22/17 Council Public Hearing & Adoption of the Sub Area Plan; Public Hearing, Approval, and Introduction of the ODD
6/12/17 or 6/19/17 Council Enactment of the ODD